Skip to main content
Joondalup ElectricianLicence EC 9715

EC 9715 Licensed

Switchboard Upgrades in Joondalup

If your switchboard still has ceramic fuses, no RCDs, or a 60-amp main that trips every time the aircon and oven run together - it is time. Most Joondalup homes built before 1990 are running boards that were fine for the appliance load of that era but are not sized for what modern families run.

What I do

  • Full switchboard replacement - old fuse box to modern RCD-split board
  • RCD retrofit where the existing board can accommodate it
  • Main switch upgrade from 60A to 80A or 100A where Western Power allows
  • Three-phase upgrades for workshops, EV chargers, or high-load households
  • Dedicated kitchen sub-circuit (stops the oven-plus-kettle trip)
  • Dedicated aircon circuits (split system or ducted)
  • Sub-board installs for sheds, granny flats, pool areas
  • Meter relocation where required for board access

Common jobs in Joondalup

70s-80s Padbury, Greenwood, Warwick homes with ceramic fuses and no RCDs - full board changeover in a day where the meter position allows.

Rental compliance at lease changeover - agent wants two RCDs and the existing board cannot take them, so we upgrade the board and do hardwired smokes at the same time.

EV charger pre-install - existing 63A main will not handle a 7kW charger plus the rest of the house, so we upgrade to 100A before the charger goes in.

Kitchen renovation in an 80s Kingsley home - the original ring circuit cannot handle an induction cooktop, so we run a dedicated 32A sub-circuit from the board.

What to SMS or photograph

  • Photo of your current switchboard, cover off if you can safely open it
  • Photo of your meter box (so I can see the main fuse rating)
  • What is prompting the upgrade - tripping, renovation, EV charger, compliance?
  • Your suburb and street address

SMS Tony at 0415 966 469 with a photo of your board. I will come back with a fixed quote and the next available slot.

FAQs

How long does a switchboard upgrade take?

Most standard upgrades are done in a day. Three-phase upgrades or jobs that need Western Power involvement for a larger main take longer - I will tell you upfront.

Will the power be off all day?

The main is off for 4-6 hours typically. I can run a temporary feed for your fridge and work computer if you need it.

Do I need to upgrade if I am just adding an EV charger?

Depends on your existing main fuse rating. Most 63A mains can handle a 7kW charger if you are not running three aircons at the same time. I will do a load assessment before quoting the charger.

What is included in a switchboard upgrade quote?

New board, new RCDs (minimum 2, usually 4 for a modern split), new MCBs for all circuits, new main switch, labelling, test certificate. Meter relocation and Western Power fees are quoted separately if needed.

Fast QuoteCall Tony